Completed Project β€” Inverness, IL

Full Bathroom Gut Remodel β€” Calacatta Marble Tile, Floor to Ceiling

Inverness, IL  Β·  November 2025  Β·  Full Bathroom Renovation  Β·  23-Year-Old Bathroom Transformed
← Back to Gallery

Location

Inverness, IL

Project Type

Full Gut Remodel

Duration

3 Weeks

Wall & Ceiling Tile

Calacatta Marble Porcelain

Floor Tile

Calacatta Porcelain

Vanity Top

Calacatta Quartz

Shower Door

Frameless Sliding Glass

Mirror

LED Backlit Smart Mirror

Phase 1
Before β€” A 23-Year-Old Bathroom
The original bathroom was 23 years old β€” dated 12Γ—12 tile, a sliding frosted glass door, an old tub/shower combo, and a granite-top vanity that had seen better days. The homeowners wanted a complete transformation: a walk-in shower, modern large-format tile, and finishes that matched the caliber of their Inverness home. Everything came out down to the studs.
Before β€” original 23-year-old bathroom in Inverness IL with dated tile and sliding glass door Before β€” original granite vanity and dated fixtures Inverness IL bathroom

Phase 2
Demo & Home Protection
Before demo started, the entire adjacent living area was sealed off with plastic sheeting from floor to ceiling β€” protecting the homeowners' furniture, flooring, and air quality throughout the project. Full gut demolition followed: all tile, drywall, and fixtures removed down to the concrete block wall and subfloor. New copper plumbing rough-in was set for the updated shower layout.
Home protection β€” full plastic sheeting before bathroom demo in Inverness IL Demo complete β€” studs and concrete block exposed, new copper plumbing rough-in

Phase 3
Waterproofing System
The waterproofing system is what separates a remodel that lasts 5 years from one that lasts 25. GoBoard cement backer was installed on all shower walls β€” a fully waterproof, mold-resistant substrate. The Wedi shower pan system was set with a Noflo waterproof membrane over the entire shower floor, sealed at every seam and corner. This is the work that's never seen again once tile goes up, but it's the most important phase of the project.
GoBoard waterproof backer with Wedi shower pan system β€” Inverness IL bathroom remodel GoBoard walls, new exhaust fan and recessed light rough-in β€” Inverness IL Noflo waterproof membrane over shower pan β€” Inverness IL bathroom

Phase 4
Calacatta Tile β€” Floor, Walls & Ceiling
The signature decision on this project: carrying the Calacatta marble-look porcelain to the ceiling on all four walls, including the shower ceiling. Large-format tiles were installed with precision leveling clips throughout to achieve near-zero lippage across every surface. A mud bed was floated for the main bathroom floor. The shower floor was tiled in the same Calacatta with a diamond-set drain centered in the layout. A custom triple niche was built into the shower wall β€” three shelves, all wrapped in matching tile.
Calacatta shower floor tile with precision leveling clips β€” Inverness IL Wire lath and mud bed preparation for Calacatta floor tile β€” Inverness IL
Mud bed floated smooth β€” level substrate for large-format Calacatta tile Inverness IL
Calacatta wall tile going up with laser level, niche in progress β€” Inverness IL Ceiling tile installation β€” Calacatta carried to the ceiling β€” Inverness IL
Shower walls tiled, bathroom floor prep with laser level β€” Inverness IL Tile near complete β€” walls, ceiling, and triple niche shelves β€” Inverness IL

Phase 5
Finished β€” Complete Transformation
The completed bathroom features floor-to-ceiling Calacatta marble porcelain on all walls and the shower ceiling, a new walk-in shower with frameless sliding glass door and rain head system, custom triple niche with three shelves, Calacatta quartz vanity top, new white shaker vanity with brushed nickel hardware, LED backlit smart mirror, and a designer square drain centered in the shower floor. Three weeks from first demo day to final walkthrough.
Finished bathroom remodel Inverness IL β€” Calacatta tile, frameless glass door, rain head, triple niche
Finished β€” full bathroom overview with Calacatta marble tile Inverness IL Finished β€” custom triple niche with Calacatta tile Inverness IL shower
Finished β€” decorative square drain in Calacatta marble shower floor Inverness IL Finished β€” vanity with Calacatta quartz top and LED backlit mirror Inverness IL Finished β€” shower floor overhead with corner shelf and drain Inverness IL
Start Your Project

Ready for a Bathroom Transformation in Inverness?

Free on-site estimate, all permits handled, written pricing before we start. Most Inverness homes can be fully transformed in 3–4 weeks. Call Yordan directly for a walkthrough.

Get Free Estimate Call (630) 340-1966

Related Pages

Bathroom Remodeling Inverness β†’ Inverness Remodeling Contractor β†’ Schaumburg Blue Onyx Project β†’ View All Projects β†’ Bathroom Remodel Guide β†’